Project Details
Security Fencing & Geogrid Fabric Installation
Project Description
This project involved comprehensive security fencing works and large-scale geogrid fabric installation to enhance site protection and control sand movement across multiple locations. The scope covered removal, repair, and installation of fencing systems, along with extensive sand stabilization works using geofabric and HDPE sand fences. All activities were executed in strict compliance with Saudi Aramco engineering and safety standards to ensure long-term durability and site safety.
Scope of Work
- • Removal, repair, and replacement of existing security fences
- • Installation of new fence systems as per approved drawings
- • Construction of concrete foundations and footings for fence posts
- • Supply and installation of:
- Fence posts
- Wire meshes
- Gates and access control points
- • Execution of all civil works, including:
- Excavation
- Backfilling
- Compaction
- Site restoration
- • Installation of approximately 50,000 meters of geofabric and HDPE sand fences
- • Deployment of sand control systems over:
- Sand dunes
- Hard ground
- Rocky surfaces
- • Construction of berms for sand containment
- • Installation of support posts and tension wires
- • Fixing and anchoring of geofabric materials
- • Application of sand stabilization treatments
- • Provision of all:
- Skilled manpower
- Equipment and machinery
- Tools and materials
- • Execution of work only upon instruction from Saudi Aramco representatives
- • Full compliance with:
- Saudi Aramco standards
- HSE regulations
- Permit-to-work systems
Project Features
- Large-scale sand control solution using HDPE geofabric
- High-quality security fencing systems for site protection
- Engineered foundations ensuring long-term structural stability
- Execution across varied terrain (sand dunes, rocky surfaces, flat land)
- Strict adherence to Saudi Aramco specifications
- Skilled workforce with HSE-certified personnel
- Effective coordination and site management
- Durable materials designed for harsh environmental conditions
- Improved site security and accessibility
Industry
Oil & Gas
Location
Abqaiq-Saudi Arabia
Sector
Commercial
Status
Completed
Year
2025










