Project Details
Oil Pit/Pond Repair & Construction
Project Description
This project involves the rehabilitation and upgrade of existing containment ponds and pits through the removal of aged liner systems and installation of high-performance HDPE liners. The objective is to enhance environmental protection, ensure regulatory compliance, and improve long-term operational integrity.
Our scope includes complete site verification, controlled demolition of existing 30-mil HDPE liners, and installation of new 60-mil HDPE liners in strict accordance with SGED/PCU-159/20 standards. All civil works, temporary containment solutions, quality control, and final restoration activities are executed to the highest industry standards.
This project demonstrates our expertise in environmental containment systems, specialized lining solutions, and complex civil construction works in operational industrial environments.
Scope of Work
• Detailed site inspection and condition verification
• Safe demolition and removal of existing 30-mil HDPE liner
• Supply and installation of new 60-mil HDPE liner
• Construction and removal of temporary lined pits
• Earthworks and civil construction activities
• Preparation of anchoring trenches
• Removal of sand, oily sand, and sludge as required
• Liner welding, testing, and quality assurance
• Pit reconstruction and reinstatement
• Submission of as-built drawings
• Final site clearance and waste disposal
Key Features
✔Compliance with SGED/PCU-159/20 specifications
✔ High-durability 60-mil HDPE liner installation
✔ Specialized containment system expertise
✔ Stringent quality control and testing
✔ Environmentally responsible waste handling
✔ Temporary pit construction capability
✔ Complete site restoration
✔ As-built documentation provided
Industry
Oil & Gas
Location
Abqaiq-Saudi Arabia
Sector
Commercial
Status
Completed
Year
2025













