Project Details

Increase Sand Cover of bowed-up Sections at CGPD (Berm Construction)

Project Description

This project focused on restoring pipeline integrity at CGPD by increasing sand cover and rehabilitating pipe berms at bowed-up pipeline sections. The works ensured safe pipeline support, adequate cover, and long-term protection in compliance with Saudi Aramco engineering and safety standards. The scope was executed in parallel across multiple locations to minimize operational impact and maintain right-of-way accessibility.

Scope of Work

  • • Detailed site inspection and condition verification
  • • Identification and correction of bowed-up pipeline sections through sand cover enhancement and berm construction
  • • Construction, rehabilitation, and re-profiling of pipe berms to achieve minimum required pipeline cover
  • • Preparation and reconditioning of right-of-way for safe access and equipment movement
  • • Excavation and exposure of pipelines with approved excavation safety systems
  • • Pipe support during works to prevent overstress and deformation
  • • Removal of existing pipe wraps and surface preparation
  • • Inspection and non-destructive testing (NDT) of exposed pipelines
  • • Grit blasting and re-coating of pipelines in accordance with APCS 113-A
  • • Installation of protective sleeves and pipe replacements where required
  • • Backfilling with suitable materials and compaction to specified levels
  • • Final restoration of berms and sand cover to original or improved condition
  • • Compliance with applicable Saudi Aramco Engineering Standards (SAES) and safety requirements

 

Industry

Oil & Gas

Location

Abqaiq-Saudi Arabia

Sector

Commercial

Status

Completed

Year

2025