Project Details
Sand Blasting & Coating of Pipes
Project Description
This project involved comprehensive pipeline rectification and rehabilitation works executed to restore pipeline integrity, ensure regulatory compliance, and improve long-term operational safety. The scope covered structural correction, right-of-way rehabilitation, and full pipeline surface treatment in accordance with Saudi Aramco Engineering Standards (SAES).
Scope of Work
- • Execution of parallel pipeline rectification activities, including correction of bowed-up pipeline sections and berm wash-ups
• Preparation and rehabilitation of pipeline right of way (ROW) to ensure safe access, proper bedding, and compliance with minimum cover requirements
• Rehabilitation of pipe berms, including reshaping, compaction, and restoration to original design profiles
• Exposure of pipelines through controlled excavation, including provision of excavation safety systems and temporary pipe supports
• Removal of existing wraps and surface protection systems for inspection and treatment
• Performance of pipeline inspections and Non-Destructive Testing (NDT) to assess pipe condition
• Surface preparation through abrasive grit blasting
• Application of approved protective coating system (APCS-113A)
• Installation of repair sleeves, pipe replacements, and flange works where required
• Controlled backfilling using approved materials and methods
• Final restoration of berms, ROW, and pipeline cover in full compliance with Saudi Aramco standards and specifications
Key Features
- • Full compliance with Saudi Aramco Engineering & Safety Standards
- • Integrated execution of civil, mechanical, and coating works
- • Enhanced pipeline integrity and long-term corrosion protection
- • Improved ROW accessibility and structural stability
- • High-quality inspection, testing, and documentation practices
Industry
Oil & Gas
Location
Abqaiq-Saudi Arabia
Sector
Commercial
Status
Completed
Year
2025