Project Details
Car Parking Shade Installation at CGPD
Project Description
This project involved the design, supply, and installation of car parking shade structures across 12 facilities, including administrative and maintenance buildings. The objective was to provide durable, weather-resistant shaded parking solutions to improve employee comfort and protect vehicles from harsh environmental conditions.
Scope of Work
Our team executed the complete parking shade installation works, including:
- • Supply and installation of single-type parking shade structures
- • Each shade designed to accommodate two vehicles under one fabric canopy
- • Construction of two reinforced foundations per shade to support the structure
- • Installation of steel structural members and high-quality shade fabric
- • Coverage area of approximately 36.96 m² per shade (adjusted when required to maintain safety and stability)
- • Compliance with the approved reference drawing IL-DW-001
- • Engineering design to withstand wind speeds up to 170 km/h
- • Structural alignment, leveling, and secure anchoring
- • Final inspection and handover
Key Features
- • High-strength structural steel framework
- • UV-resistant, weatherproof shade fabric
- • Wind-load compliant design for harsh climate conditions
- • Precision foundation works for long-term stability
- • Professional installation by certified technicians
- • Strict quality control and safety compliance
Project Value Delivered
- • Enhanced vehicle protection from sun and weather
- • Improved facility infrastructure
- • Long-lasting, low-maintenance shade structures
- • Compliance with engineering and safety standards
- • Professional project execution within schedule
Industry
Oil & Gas
Location
Abqaiq-Saudi Arabia
Sector
Commercial
Status
Completed
Year
2025










